Open post

Leigh Park Community Centre

ERMC architects in Hampshire were employed to collaborate with the construction of a new community centre as part of a Section 106 Agreement within a Persimmon Homes residential estate development.  The design of the community centre had already received a successful planning approval in 1998 as part of the residential development that it was associated […]

Continue readingMore Tag
Open post

RIBA South Award

ERMC architects in Hampshire are celebrating a second shortlisting for a national award for their architecture and project management work at Hotwalls in Portsmouth. Now shortlisted for the RIBA South Building Awards as 1 of 15 buildings from an area that covers Berkshire, Buckinghamshire, Hampshire, the Isle of Wight, Middlesex and Oxfordshire, recognition for our […]

Continue readingMore Tag
Open post

Dulwich Wood Primary School

ERMC were employed by the main contractor for Southwark Council to complete the detailed architectural design of the original concept of this £1.5m project for Dulwich Wood Primary School.  The concept scheme involved considerable challenges, which through collaboration and rigorous design processes we brought successful completion for our client and the end users.  Our design […]

Continue readingMore Tag
Open post

Sandown High School

ERMC were employed by Isle of Wight Council to provide Architectural, Surveying & CDM Coordination for this £2.5m project extending Sandown High School. The school required an extension to their existing campus to provide specialist 6 form units with capabilities to provide performance facilities for the wider community and local business.   The existing school […]

Continue readingMore Tag
Open post

Freshwater Early Years Centre

ERMC architects on the Isle of Wight were tasked with the design and construction of the Freshwater Early Years Centre, set within the grounds of All Saints Primary School, to replace the existing nursery, which was run from a dilapidated mobile.  This project had many significant challenges including topography, its central location within a fully […]

Continue readingMore Tag
Open post

Carisbrooke Art Block

The original Carisbrooke Art Block at the high school (now Carisbrooke College) was in poor condition both internally and externally. The external panelled walls and glazing allowed the classrooms to significantly overheat in the summer months. Its appearance was drab and uninspiring, needing a visual lift from our architects and surveyors on the Isle of […]

Continue readingMore Tag
Open post

Grove Primary School

The works comprised of internal alteration, major remodelling and a single storey extension to the existing Grove Primary School building, to recover the roof and form an infill to an existing open courtyard area to provide additional group space. Other works included a minor flat roof extension and remodelling of the existing Reception area to […]

Continue readingMore Tag
Open post

Fullwood Primary School

The design of Fullwood Primary School for Neilcott Construction, on behalf of the London Borough of Redbridge, comprised of further extensions of approximately 802 sqm and major refurbishment of an existing bungalow style, single-storey school. Phase 1: 2 new reception classrooms, stores, toilets, small extension to the nursery kitchen and link back to the existing […]

Continue readingMore Tag
Open post

Temporary Accommodation Progamme

East Sussex County Council’s programme for providing ‘temporary’ classroom buildings to Schools throughout the County to accommodate rising pupil admission numbers at Primary School level.This comprises of the provision of modular / prefabricated buildings that have the comfort and robustness of a permanent classroom.From the initial brief taking to handing over the new buildings in […]

Continue readingMore Tag

Posts navigation

1 2 3 4 5 6
Scroll to top