top of page

DULWICH PRIMARY SCHOOL

ermc were employed to complete the detailed architectural design of the original concept team. We worked on behalf of the successful design and build contractors post tender. The concept scheme involved considerable challenges, which through collaboration and rigorous design processes we brought successful completion for our Client and the end users.

Elements of the design were split level with a larger first floor built over a smaller ground floor. A mix of structural solutions were employed including, integral retaining and tanking structures, piled foundations, reinforced concrete and deep fill mass foundations, along with timber frame and glulam timber structures. These varying techniques were employed to overcome specific site constraints, yet maximise value engineering for our client, speed of erection and preferred sub contract packages.