Fullwood Primary School

The design of Fullwood Primary School for Neilcott Construction, on behalf of the London Borough of Redbridge, comprised of further extensions of approximately 802 sqm and major refurbishment of an existing bungalow style, single-storey school.

Phase 1: 2 new reception classrooms, stores, toilets, small extension to the nursery kitchen and link back to the existing School; Phase 2: new hall, 2 new classrooms, IT suite, server room, IT workroom, access WC, changing room with WC and stores. A new group room was also added to the existing building; Phase 3: modifications to the front entrance, reception and administration block, internal alterations, M&E and external works.

Scroll to top