Hill Farm

ERMC architects completed the conservation, partial reconstruction and conversion of a dilapidated ‘piggery’ into a two bedroom holiday unit set within a smallholding, working farm.  The proposals included a new oak framed living room extension, veranda and landscaped grounds. The brief was to sympathetically extend and convert this modest structure whilst retaining its agricultural heritage […]

Continue readingMore Tag
Open post

Tom Rudd Unit, Moorgreen Hospital

ERMC Hampshire architects were presented with a brief that consisted of major internal alterations and refurbishment of redundant spaces to provide additional accommodation. Works further entailed the demolition of an existing poor quality conservatory extension and interior rearrangement in order to better serve the Unit’s changing needs. With major internal demolitions and alterations taking place […]

Continue readingMore Tag
Open post

Sandown High School

ERMC were employed by Isle of Wight Council to provide Architectural, Surveying & CDM Coordination for this £2.5m project extending Sandown High School. The school required an extension to their existing campus to provide specialist 6 form units with capabilities to provide performance facilities for the wider community and local business.   The existing school […]

Continue readingMore Tag
Open post

Carisbrooke Art Block

The original Carisbrooke Art Block at the high school (now Carisbrooke College) was in poor condition both internally and externally. The external panelled walls and glazing allowed the classrooms to significantly overheat in the summer months. Its appearance was drab and uninspiring, needing a visual lift from our architects and surveyors on the Isle of […]

Continue readingMore Tag
Open post

Grove Primary School

The works comprised of internal alteration, major remodelling and a single storey extension to the existing Grove Primary School building, to recover the roof and form an infill to an existing open courtyard area to provide additional group space. Other works included a minor flat roof extension and remodelling of the existing Reception area to […]

Continue readingMore Tag
Open post

Fullwood Primary School

The design of Fullwood Primary School for Neilcott Construction, on behalf of the London Borough of Redbridge, comprised of further extensions of approximately 802 sqm and major refurbishment of an existing bungalow style, single-storey school. Phase 1: 2 new reception classrooms, stores, toilets, small extension to the nursery kitchen and link back to the existing […]

Continue readingMore Tag