Open post

NICU, St. Mary’s Hospital

Our architects and surveyors on the Isle of Wight were tasked with the relocation and comprehensive upgrading of departmental facilities including 3 bespoke Administration/Reception Areas for the I.W. Healthcare NHS Trust.  The brief was to provide a fully functional facility with a controlled environment tailored to the unique intensive care requirements. The provision of a […]

Continue readingMore Tag
Open post

Tom Rudd Unit, Moorgreen Hospital

ERMC Hampshire architects were presented with a brief that consisted of major internal alterations and refurbishment of redundant spaces to provide additional accommodation. Works further entailed the demolition of an existing poor quality conservatory extension and interior rearrangement in order to better serve the Unit’s changing needs. With major internal demolitions and alterations taking place […]

Continue readingMore Tag
Open post

Grove Primary School

The works comprised of internal alteration, major remodelling and a single storey extension to the existing Grove Primary School building, to recover the roof and form an infill to an existing open courtyard area to provide additional group space. Other works included a minor flat roof extension and remodelling of the existing Reception area to […]

Continue readingMore Tag
Open post

Fullwood Primary School

The design of Fullwood Primary School for Neilcott Construction, on behalf of the London Borough of Redbridge, comprised of further extensions of approximately 802 sqm and major refurbishment of an existing bungalow style, single-storey school. Phase 1: 2 new reception classrooms, stores, toilets, small extension to the nursery kitchen and link back to the existing […]

Continue readingMore Tag
Open post

Dunraven Primary School

ERMC architects in London were appointed to complete the architectural and landscaping design of this multi-storey refurbishment project for Dunraven Primary School. The existing structural concrete frame was retained and heavily modified to suit new ventilation access and service distribution challenges.  New thermal elements an re-cladding was added to suit modern compliance and deal with […]

Continue readingMore Tag
Scroll to top